Monthly Archives: November 2018

Nokia Siemens Flexi BTS base station teardown: Circuit analysis (part 2 of 2)

Circuit analysis of a Nokia Siemens Networks Flexi BTS base station. This have been in service as a 6 antenna GSM system for mobile telecommunications. GSM/EDGE, WCDMA/HSPA and LTE capable. 2×40 Watt output power. If you missed part 1, see … Continue reading

Posted in Teardown | Tagged , , , , , , , | Leave a comment

Youtube subscription change, please check!

Since youtube changed their notification setup a long while ago, you might be missing out on notifications about my new videos. Be sure to check if you have the “bell” clicked next to the subscription! Thank you 🙂 Check here: https://www.youtube.com/channel/UCSukTlgTEWiL-sl0UeYeJvQ

Posted in News | Tagged | Leave a comment

Moving to a new lab (part 5 and 6) tour and finally its operational

Here you get a short glimpse of the new space for the laboratory and the final setup. This is part 5 and 6 in a series of videos on moving out, moving in and setting up the new lab / … Continue reading

Posted in News | Tagged | Leave a comment